top of page
ext_selatan.jpg

SAP 2 "Semarang Islamic Hospital"

This is SAP 2 Studio assignment, which is i've to Planning Type C Hospital Building with 100 Beds Capacity in accordance with the demands of the needs and aspirations of the user. With encouraging work productivity (enhance productivity), reducing building operational costs (reduce cost), design
a flexible space and ensures user interaction
(fexibility+interaction), Improve the image (Express The Brand) and reduce the impact on the environment (reduce environmental impact) goals.

* Click the picture then swipe picture to see all 

bottom of page